USA: +1 202 345 8189

Nigeria: + 234 807 400 0013

Plot 1138, Suite 8, Canal House; Central Business District, Abuja

logo

phone: + 234 807 400 0013

 

Fuel Tanks

WORLDWIDE EMBASSY UNDERGROUND STORAGE TANK PROJECTS

Architecture, Engineering, and Construction Management: Dynamic Corporation
Client: US Department of State
Performance Period: 2003- 2008
Total Contract Amount:
$3 million
Total Construction Budget
$30 million
Location: Embassies Worldwide

This project involved a multiple visits to the different sites to inspect existing fiberglass fuel storage tanks to assess their suitability for use and installation.

To inspect the planned installation locations to determine the feasibility of Installing the existing tanks at these locations.

Gathering Specific Technical Site Data to develop Project design, Specifications, Cost Estimate, and Work Schedule for planned UST projects at post.

Diagnose, Pressure test UST System, RSA and Data Base, and Report preparation.

Provide Q/C and Technical Oversight for timely Completion during installation of the new fuel tank System at these Embassies World Wide: Papua-New Guinea, Lagos-Nigeria, Manilla-Phillipines, Hague-Netherlands, Yaoundé-Cameron, Libreville-Gabon, Cairo-Egypt, Ouagadougou-Burkina Faso, Azerbaijani-Baku, Minsk-Damascus Syria, Buenos Aires-Argentina, Kingston-Jamaica, Paramaribo-Suriname, Nouakchott-Mauritania, Bangkok-Thailand, Vientiane-Laos, Warsaw-Poland, Niamey-Niger and More.

Recent projects

  • Bridges

  • Rail Road

  • Power

  • Pipeline

  • Fuel Tanks

  • Water/ Wastewater

  • Educational Facility

  • Government

  • Housing Facility

  • Health Care

  • Security