Water/ Wastewater Treatment
MULTIPLE RENOVATIONS AT THE DISTRICT OF COLUMBIA WATER TREATMENT PLANT AND ASSOCIATED FACILTIES
Client:
District of Columbia Water and Sewer Authority
Performance Period:
Aug 2006-Mar 2008
Total Contract
Amount: $1,578,000
Location:
Washington DC
At East Side Waster Water Treatment and Pumping Station Dynamic Corporation performed the following services with its own staff:
demolition and removal of existing pumps and grinders, demolition of existing concrete walls and mechanical ducts.
Forming and installing electrical duct banks for electrical and other utilities; installing reinforced concrete containment area.
Dynamic subcontracted the installation of Mechanical Duct, new grinder and Pump for this project.
At Polar Point Water Treatment Station
Dynamic staff demolished and abated lead and asbestos from the facility, removed and dispose mechanical ducts and painter the facility.
Dynamic subcontracted the following work, installation of Mechanical System to lift bio-solids, grind and pump the by products into a 72 inch diameter RCP feeding Blue Plains Waste Water Treatment Plant.
At O Street Pumping Facility
Dynamic removed and reinstalled roofing at the Facility.
Dynamic subcontracted the installation of remote monitoring system to track water levels and control flooding at 10 locations tied into the O Street Pumping Station.