Qualcomm Building AY

Qualcomm, Building AY
San Diego, CA

This was a new building and the originally scheduled towers were by Evapco. Qualcomm was very pleased with the Tower Tech cooling towers they used on Building WP and were also very concerned with the amount of drift that would come from the towers on Building AY since it was mostly glass on the outside, and the metal towers with the fans up top put out over 10 times the drift of Tower Tech. See https://hope-amundson.com/projects/qualcomm-campus-building-ay-officelab-building-az-amenities/ for more information on this job and the awards it got.

The schedule calls for 2,100 GPM each. The towers used on this job are capable of handling anything between 800 GPM and 4,800 GPM.

Mechanical Engineer : MA Engineers
General Contractor : DPR
Mechanical Contractor : Pacific Rim Mechanical