It should be noted that all of the signalization projects have generally involved illumination and channelization improvements. Thus, these projects would not be repeated under the other sub-categories.

Petrovitsky Road/Petrovistky Parkway (Parkside Drive), King County, WA. Prepared signal PS&E for the construction of a new signal at the intersection. Project was fast-tracked through the County with plans complete and approved and signal constructed and operational within 7 months from design start.

Petrovitsky Parkway/School-Park Pedestrian Crossing, King County, WA. Prepared signal PS&E for the construction of a new pedestrian signal and provided assistance through construction. Project was fast-tracked through the County review.

Riverside Bridge Replacement, Mt Vernon, WA. Prepared signal design plans, and cost estimates for the construction of a new signal at the intersection of Riverside Dr/Pacific Pl, as well as for the signal modifications at the Burlington Blvd/George Hopper Rd intersection. In addition, prepared 3 separate temporary signals for three different phases of construction at the Burlington Blvd/Whitmarsh Rd intersection. Furthermore, prepared interconnect plans on Riverside Drive and Burlington Boulevard between Continental Place to George Hopper Road.

Other project include:
  • Columbia Slough Consolidation Conduit, Traffic Signal Modifications and Traffic Control, Portland, OR.  P
  • S 212th Street/84th Ave S (E Valley Hwy), Kent. 
  • S 212th Street/72nd Ave S, Kent. 
  • Bellevue I-90 Business Park Signalization and Illumination  Design, Bellevue.
  • West Lake Sammamish Parkway/NE 40th St, Redmond.
  • S 228th Street/Interurban Trail, Smith St/Interurban Trail, and Meeker St/Interurban Trail, Kent
  • S 212th Street/Interurban Trail, Kent.
  • Valley Mall Parkway/6th St, East Wenatchee.
  • Valley Mall Parkway/5th St, East Wenatchee.
  • SE 240th St/108th Ave SE, Kent.
  • NE 4th St/228th Avenue NE Signalization, Sammamish.
  • Central Avenue/South 259th Street, Kent.
  • Central Avenue/East Gowe Street, Kent.
  • NE 8th St/242nd Avenue NE Signalization, Sammamish.
  • I-405/Totem Lake Interchange Ramp Signals (3), Kirkland.
  • NE 124th St/116th Avenue NE, Kirkland.
 
 