Useful Links About Us Projects Services Clients Contact WILLIAM POPP ASSOCIATES
SIGNING AND CHANNELIZATION

 

As noted in the Signals listing, the vast majority of signal design projects also include channelization improvements. The following is a list of additional projects of which the main emphasis was signing and channelization improvements.

SR 150, Manson WA. Prepared PS&E for left-turn lane channelization and temporary construction detour plans and road closure plans.

Columbia Slough Consolidation Conduit, Traffic Control, Portland, OR. Prepared extensive detour plans and temporary channelization plans for five intersections along Columbia Boulevard due to major sewer main construction.

Other projects include:

  • SR 203/New Big Rock Road, Duvall, WA.
  • SR 527; Wedgewood Site Access, Mill Creek, WA.
  • NE 8th St, Sammamish, WA.
  • 228th Ave NE, Sammamish, WA.
  • SR 202/Ribrary Road, North Bend, WA.
  • SR 203/Woodinville Duvall Road, Duvall, Washington.
  • Valley Freightliner Access, Pierce County, Washington.