Construction Claims

Construction Claims

Here what we do for you is we analyze, define and quantify the claim in as logical of a fashion as can be put on paper so that your decision-makers can logically understand what is being claimed.

Personal experience has indicated to me that poor communication, lack of project logs and sign in sheets, lack of logging in materials brought on site have made it all but impossible to quantify the maximum potential effort a vendor could have given. This is something different from the actual work in place as sometimes a lack of productivity is now being brought into play because an area is not ready to be worked on when it was supposed to and or conditions were materially different than what was anticipated. This and many other factors play a role in how a construction claim can be viewed.

While we do not replace your management team, or your legal team we know play the role of an independent third-party looking at it with a fresh set of eyes and no vested interest. This will sometimes assist the management team in making painful decisions quickly. Sometimes although not necessarily morally correct, a clean set of eyes can help you come to a financially correct decision before too much money is spent.

The only ones that ever make the decisions are your management team & your legal team. We only assist in providing an unbiased point of view & raw data.

What we can help with is:
  • the identification of claims
  • Means and methods
  • Risk evaluation and quantification
  • Unforeseen and differing site conditions
  • Damage assessments
  • Change order details/impacts
  • General change order costs
  • Time impact analysis & schedule delays
  • Productivity impacts
  • Acceleration cost claims
  • Claims mitigation documentation & presentations
  • • Construction mediation, litigation and arbitration support Estimating services

We are able to Provide the Standardized Format Reports
1. Square Foot Cost Estimate Report.
2. Assemblies Cost Estimate Report.
3. Line Item Takeoff Cost Estimate Report. 16 or 50 CSI

Estimating from paper plans can be done, but is slower and slightly more costly.

Computer Takeoffs are quicker and less expensive & slightly more accurate. Our preference is Adobe PDF or Tiff files preferably color.

We have the ability of utilizing many databases including the RS means database below are some of the entities that have used the RS means database as part of the estimating services.

U.S. Army Corps of Engineers, US Coast Guard, National Guard Armory's, GSA, Pentagon, U.S. Department of Energy, FEMA, U.S. Department of Labor, City of Miami, Portland Cement Association, Georgia Pacific, Alcan, Cable, Institute for Water Resources, NIBS, VA Healthcare, Hunt Building Corporation. Memorial Regional Healthcare, Jackson Healthcare Systems, Poinciana Biopharmaceutical Research and Development, Miami International Airport, Hyatt Hotels just to name a few.

Increases your profit potential. The more you bid, the more estimate bids you can win.

  1. Save the cost of full-time estimator, your time to adjust the numbers & operate our business. Let Hanscomb Means provide your estimates
  2. Add to your estimating department by outsourcing when necessary to add additional projects or increase your bidding options.
  3. Letting someone else to your takeoffs at reasonable prices allows you to focus all your attention on your other business needs; equipment, personnel, price shopping etc.
  4. Our estimators all have been around 20+ years

Services and Estimating Reports Available:

  • Budgetary/ Conceptual Construction Estimates
  • Hard Bid Estimating, Schools, Malls, All Commercial Construction.
  • Cost factors and pricing in all estimate reports are based on your zip code area.
Strong history of estimating all types of public and private sector projects.

The better the information the better the quality estimate. Information that may cause the owner of the estimate to want to adjust his final pricing;

  • is the quality level unusually high for the area?
  • The number of available bidders for a job of this magnitude high or low
  • The reputation of the project owner

From the clients we need to know:

  • When do they need the estimate back
  • What format you need the estimate in (we must know this before we start)
  • The location of the project
  • Local overhead and profit & insurance markups anticipated for your area
  • Group PDF's of all drawing, sketches, photos, in order of disciplines to include all schedules i.e. Architectural, structural, civil, mechanical, electrical, plumbing.
  • All sheets must be marked with scale in which the drawing was done
  • Generally this couple days to get everything together, depending on the quality of the drawings and measurements, there may be some questions.

Cost Estimating

Cost estimating is realizing various stages for various reasons below are some generic definitions of the types and styles of estimates that are available& what can be expected from them.

Initially a conceptual or budgetary estimate is done with limited information for the purpose of having a general idea of what to give an undertaking may cost.

As designers continue to design & owners provide more input the design continues to develop the bells and whistles and desires have a tendency to grow. Solutions tend to cost money. As the design develops, estimates become more detailed and that can become part of an integrated value engineering process throughout the design phase. At the end of the schematic design and design

development stages, the cost estimator generally produces a more comprehensive project cost estimate as the project should now be better detailed & defined.

  • The final estimates are generally either labeled permit plans or construction docs (50% or 100% construction docs) and should be completely defined. The should be detailed documents outlining everything that the owners are expecting to have built. These detailed documents will provide a detailed construction estimate & is the product of a process whereby the cost of a proposed construction project is predicted within a margin of error. The estimate is prepared by breaking down the items of work in an orderly and logical basis, determining the cost of each item from a database coupled with experience.
  • Overhead, profit, insurances & permitting percentages will generally be provided by you the requester as there will be no one more familiar with your local economy then you are. You would have a better idea of knowing what your competition is doing & and what you have done in the past. What we are able to do for you is generate by your ZIP Code what item costs and generalized labor costs would be for any given item. In order to be is accurate as possible with the overall price it would be sensible to you to review the estimate pricing for those things that you are familiar with and make any minor adjustments you deem fit based on what you've seen local companies bid & your ability to compete with.
  • Estimate accuracy is based on measuring and pricing of quantities where the information provided. The more work done by subcontractors the greater the overall contract cost will be as each subcontractor will have his own markup in the overall contractor will then again have a markup. Our pricing reflects the probable construction cost obtainable in a project locality based on ZIP Code, is not a prediction of the low bid. Many factors can affect bids, from the pay history of the person requesting the bids, to the size of the bid packages & bonding requirements, to the number of qualified bidders for that particular type of work in that area or even the complexity of the work can affect how much of a contingency each individual bidder may add to his bid in order to protect his company. The accuracy of an estimates dependent on various external factors, but the line items estimate will generally be within about 7% on a good set of plans. The additional variances will come in quickly from: project desirability, difficulty, specialty items, subcontractor markups, contractor markups the various overheads & cause that % variation to rise.

Win new business

You have ideas, goals, and dreams. We have a culturally diverse, forward thinking team looking for talent like. Lorem ipsum dolor sit amet integer suscipit.

Learn More

Save time and cost

You have ideas, goals, and dreams. We have a culturally diverse, forward thinking team looking for talent like. Lorem ipsum dolor sit amet integer suscipit.

Learn More

Increase credibility

You have ideas, goals, and dreams. We have a culturally diverse, forward thinking team looking for talent like. Lorem ipsum dolor sit amet integer suscipit.

Learn More